Design and establishment of an Integrated Management System (IMS), technical support during implementation and certification to ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018
Key Deliverable(s):
Design and establishment of an Integrated Management System (IMS), technical support during implementation and certification to ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018
Key Deliverable(s):
Design and establishment of an Integrated Management System (IMS), technical support during implementation and certification to ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018
Key Deliverable(s):
Design and establishment of a Quality Management System (QMS), technical support during implementation and certification to ISO 9001:2015
Key Deliverable(s):
Air Dispersion Modelling for the proposed 200,000 tonnes per annum cement grinding and bagging plant
Key Deliverable(s):
Air Dispersion Modelling for the proposed 500,000 tonnes per annum cement grinding and bagging plant
Key Deliverable(s):
Air Dispersion Modelling for the proposed 9,000 tonnes per annum cement grinding and bagging plant
Key Deliverable(s):
Hazard mapping for the 200,000 tonnes per annum cement grinding and bagging plant
Key Deliverable(s):
Environmental and Social Impact Assessment (ESIA) for the proposed General Agricultural Farming Project to meet local (Ghanaian) requirements
Key Deliverable(s):
Land Use Analysis, Landcover classification and Mapping as part of the Baseline Socio-economic and Ecological Assessment of the Asunafo-Asutifi Hotspot Intervention Area
Key Deliverable(s):
Accessibility Analysis of Public Ambulance Services: A Case Study Of The Sekondi-Takoradi Metropolis
Key Deliverable(s):
Environmental and Social Management Plan (ESMP) for the proposed Gas Conditioning Plant (GCP), transportation and storage in Cryogenic Tanks Project to meet local (Ghanaian) and international (IFC Performance Standards, Equator Principles, World Bank Sustainability Framework) requirements
Key Deliverable(s):
Ambient Air Quality and Ambient Noise Level Monitoring for the Palm Oil And Kernel Processing Plant to meet the Ghana Standards for Environment and Health Protection
Key Deliverable(s):
Biophysical and Socio-economic Baseline Assessment as part of the Preliminary Environmental Assessment (PEA) for the proposed 1,250 tonnes per annum Cocoa Pulp Juice Processing Facility
Key Deliverable(s):
Quality Management System (QMS) Internal Audit in line with the ISO 9001:2015 International Standard
Key Deliverable(s):
Occupational Health, Safety and Quality Policies and Management Plans for a proposed aluminum profile fabrication and installation project
Key Deliverable(s):
Environmental and Social Management Plan (ESMP) for the cultivation of fruits, exotic vegetables and herbs to meet local (Ghanaian) and international (IFC Performance Standards, World Bank Sustainability Framework) requirements
Key Deliverable(s):
Environmental and Social Action Plan (ESAP) for the delivery of bespoke electrical and mechanical engineering services to meet local (Ghanaian) and international (IFC Performance Standards, World Bank Sustainability Framework) requirements
Key Deliverable(s):
Environmental and Social Action Plan (ESAP) for the provision of technical training in solar energy to meet local (Ghanaian) and international (IFC Performance Standards, World Bank Sustainability Framework) requirements
Key Deliverable(s):
Environmental and Social Management Plan (ESMP) for the operation of a hatchery and poultry husbandry to meet local (Ghanaian) and international (IFC Performance Standards, World Bank Sustainability Framework) requirements
Key Deliverable(s):
Environmental and Social Management Plan (ESMP) for the production of virgin coconut oil to meet local (Ghanaian) and international (IFC Performance Standards, World Bank Sustainability Framework) requirements
Key Deliverable(s):
Environmental and Social Management Plan (ESMP) for the cultivation of maize, rice, soybeans, butternut squash and vegetables to meet local (Ghanaian) and international (IFC Performance Standards, World Bank Sustainability Framework) requirements
Key Deliverable(s):
Environmental and Social Management Plan (ESMP) for quail husbandry and egg production to meet local (Ghanaian) and international (IFC Performance Standards, World Bank Sustainability Framework) requirements
Key Deliverable(s):